{"id":146529,"date":"2026-11-27T11:59:55","date_gmt":"2026-11-27T15:59:55","guid":{"rendered":"https:\/\/conexiondigital.com.do\/?p=146529"},"modified":"2026-11-27T11:59:57","modified_gmt":"2026-11-27T15:59:57","slug":"alejandro-campos-entrega-muelle-remozado-en-cayo-levantado-y-anuncia-licitacion-para-construir-uno-nuevo","status":"publish","type":"post","link":"https:\/\/conexiondigital.com.do\/index.php\/2026\/11\/27\/alejandro-campos-entrega-muelle-remozado-en-cayo-levantado-y-anuncia-licitacion-para-construir-uno-nuevo\/","title":{"rendered":"Alejandro Campos entrega muelle remozado en Cayo Levantado y anuncia licitaci\u00f3n para construir uno nuevo"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"730\" src=\"https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/7f9e28ad-4ca8-4518-b4ff-b54177d74117-1024x730.jpg\" alt=\"\" class=\"wp-image-146530\" srcset=\"https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/7f9e28ad-4ca8-4518-b4ff-b54177d74117-1024x730.jpg 1024w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/7f9e28ad-4ca8-4518-b4ff-b54177d74117-800x570.jpg 800w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/7f9e28ad-4ca8-4518-b4ff-b54177d74117-768x547.jpg 768w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/7f9e28ad-4ca8-4518-b4ff-b54177d74117.jpg 1040w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>La nueva infraestructura, con una inversi\u00f3n estimada de RD$40 millones, busca ampliar la capacidad de recibir embarcaciones y visitantes en Saman\u00e1.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Saman\u00e1, Rep\u00fablica Dominicana.<\/strong> El director ejecutivo de la Autoridad Portuaria Dominicana (APORDOM), Alejandro Campos, entreg\u00f3 los trabajos de remozamiento y reforzamiento del muelle tur\u00edstico de Cayo Levantado y anunci\u00f3 la apertura de la licitaci\u00f3n para construir un nuevo muelle, con una inversi\u00f3n estimada de RD$40 millones millones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Campos explic\u00f3 que el remozamiento permite mantener operativo el muelle actual mientras avanza la licitaci\u00f3n. Estim\u00f3 que la adjudicaci\u00f3n podr\u00eda tomar entre tres y cuatro meses y que la construcci\u00f3n tendr\u00eda una duraci\u00f3n aproximada de diez meses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cHoy tenemos un mensaje importante, adem\u00e1s de entregar este muelle remozado, hemos subido la licitaci\u00f3n para la construcci\u00f3n de un nuevo muelle tur\u00edstico aqu\u00ed en Cayo Levantado, con una inversi\u00f3n de alrededor de RD$40 millones. No nos quedamos solamente con este remozamiento, sino que vamos a construir una nueva infraestructura que nos permita responder a los vol\u00famenes de visitantes que estar\u00e1n llegando a esta provincia\u201d, expres\u00f3 Campos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El director ejecutivo se\u00f1al\u00f3 que el nuevo muelle busca atender el crecimiento previsto de la actividad tur\u00edstica en Saman\u00e1 con la entrada en operaci\u00f3n de terminales como Port Saman\u00e1, en Arroyo Barril, y Saman\u00e1 Bay, en Santa B\u00e1rbara de Saman\u00e1. Tambi\u00e9n destac\u00f3 la coordinaci\u00f3n con el Ministerio de Turismo, las autoridades locales, las asociaciones de gu\u00edas tur\u00edsticos y de propietarios de embarcaciones, as\u00ed como el respaldo del sector privado.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/574ee61d-80a9-4cca-a4eb-d7b6f7908c87-1024x682.jpg\" alt=\"\" class=\"wp-image-146531\" srcset=\"https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/574ee61d-80a9-4cca-a4eb-d7b6f7908c87-1024x682.jpg 1024w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/574ee61d-80a9-4cca-a4eb-d7b6f7908c87-800x533.jpg 800w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/574ee61d-80a9-4cca-a4eb-d7b6f7908c87-767x511.jpg 767w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/574ee61d-80a9-4cca-a4eb-d7b6f7908c87-300x400.jpg 300w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/574ee61d-80a9-4cca-a4eb-d7b6f7908c87.jpg 1040w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Trabajos entregados en el muelle actual<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El muelle intervenido tiene 42 metros de longitud y una superficie de 180,60 metros cuadrados. APORDOM sustituy\u00f3 los elementos de madera de la pasarela, incluidos los durmientes y las guarder\u00edas, por piezas de pino tratado. Tambi\u00e9n reforz\u00f3 la estructura met\u00e1lica e incorpor\u00f3 nueve pilotes al sistema de soporte para mejorar la estabilidad del muelle y prolongar su vida \u00fatil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Caracter\u00edsticas del nuevo muelle tur\u00edstico<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Seg\u00fan la ficha t\u00e9cnica del proyecto, el nuevo muelle tendr\u00e1 una superficie de 274,55 metros<\/strong> cuadrados y una estructura de hormig\u00f3n armado dise\u00f1ada para resistir la exposici\u00f3n al ambiente marino. La obra contempla 66 pilotes de PVC SDR-21 de 12 pulgadas de di\u00e1metro, reforzados con acero y perfiles estructurales W8\u00d740, con profundidades previstas de entre nueve y doce metros.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El dise\u00f1o incluye vigas longitudinales y transversales, una losa de hormig\u00f3n armado de 15 cent\u00edmetros de espesor con aditivos para mejorar su durabilidad, 12 luminarias solares LED de 500 vatios, 16 bitas de amarre con capacidad de entre 10 y 15 toneladas y 42 defensas de goma tipo D para proteger las embarcaciones durante el atraque. El proyecto tambi\u00e9n contempla estudios batim\u00e9tricos, geot\u00e9cnicos y medioambientales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En el acto de entrega participaron el senador de Saman\u00e1, Pedro Catrain, la gobernadora provincial, Teodora Mullix, el alcalde Nelson N\u00fa\u00f1ez y la diputada Carmen Williams. Tambi\u00e9n asistieron representantes de las asociaciones de gu\u00edas tur\u00edsticos y de propietarios de embarcaciones, as\u00ed como ejecutivos del Grupo Pi\u00f1ero y del hotel Cayo Levantado Resort<strong>.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/fb0c78a2-877f-4edd-a6ff-120b96064bcf-1024x576.jpg\" alt=\"\" class=\"wp-image-146532\" srcset=\"https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/fb0c78a2-877f-4edd-a6ff-120b96064bcf-1024x576.jpg 1024w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/fb0c78a2-877f-4edd-a6ff-120b96064bcf-800x450.jpg 800w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/fb0c78a2-877f-4edd-a6ff-120b96064bcf-768x432.jpg 768w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/fb0c78a2-877f-4edd-a6ff-120b96064bcf-1536x864.jpg 1536w, https:\/\/images.conexiondigital.com.do\/wp-content\/uploads\/2026\/11\/fb0c78a2-877f-4edd-a6ff-120b96064bcf.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>La nueva infraestructura, con una inversi\u00f3n estimada de RD$40 millones, busca ampliar la capacidad de recibir embarcaciones y visitantes en Saman\u00e1. Saman\u00e1, Rep\u00fablica Dominicana. El director ejecutivo de la Autoridad Portuaria Dominicana (APORDOM), Alejandro Campos, entreg\u00f3 los trabajos de remozamiento y reforzamiento del muelle tur\u00edstico de Cayo Levantado y anunci\u00f3 la apertura de la licitaci\u00f3n para construir un nuevo muelle, con una inversi\u00f3n estimada de RD$40 millones millones. Campos explic\u00f3 que el remozamiento permite mantener operativo el muelle actual mientras avanza la licitaci\u00f3n. Estim\u00f3 que la adjudicaci\u00f3n podr\u00eda tomar entre tres y cuatro meses y que la construcci\u00f3n tendr\u00eda una duraci\u00f3n aproximada de diez meses. \u201cHoy tenemos un mensaje importante, adem\u00e1s de entregar este muelle remozado, hemos subido la licitaci\u00f3n para la construcci\u00f3n de un nuevo muelle tur\u00edstico aqu\u00ed en Cayo Levantado, con una inversi\u00f3n de alrededor de RD$40 millones. No nos quedamos solamente con este remozamiento, sino que vamos a construir una nueva infraestructura que nos permita responder a los vol\u00famenes de visitantes que estar\u00e1n llegando a esta provincia\u201d, expres\u00f3 Campos. El director ejecutivo se\u00f1al\u00f3 que el nuevo muelle busca atender el crecimiento previsto de la actividad tur\u00edstica en Saman\u00e1 con la entrada en operaci\u00f3n de terminales como Port Saman\u00e1, en Arroyo Barril, y Saman\u00e1 Bay, en Santa B\u00e1rbara de Saman\u00e1. Tambi\u00e9n destac\u00f3 la coordinaci\u00f3n con el Ministerio de Turismo, las autoridades locales, las asociaciones de gu\u00edas tur\u00edsticos y de propietarios de embarcaciones, as\u00ed como el respaldo del sector privado. Trabajos entregados en el muelle actual El muelle intervenido tiene 42 metros de longitud y una superficie de 180,60 metros cuadrados. APORDOM sustituy\u00f3 los elementos de madera de la pasarela, incluidos los durmientes y las guarder\u00edas, por piezas de pino tratado. Tambi\u00e9n reforz\u00f3 la estructura met\u00e1lica e incorpor\u00f3 nueve pilotes al sistema de soporte para mejorar la estabilidad del muelle y prolongar su vida \u00fatil. Caracter\u00edsticas del nuevo muelle tur\u00edstico Seg\u00fan la ficha t\u00e9cnica del proyecto, el nuevo muelle tendr\u00e1 una superficie de 274,55 metros cuadrados y una estructura de hormig\u00f3n armado dise\u00f1ada para resistir la exposici\u00f3n al ambiente marino. La obra contempla 66 pilotes de PVC SDR-21 de 12 pulgadas de di\u00e1metro, reforzados con acero y perfiles estructurales W8\u00d740, con profundidades previstas de entre nueve y doce metros. El dise\u00f1o incluye vigas longitudinales y transversales, una losa de hormig\u00f3n armado de 15 cent\u00edmetros de espesor con aditivos para mejorar su durabilidad, 12 luminarias solares LED de 500 vatios, 16 bitas de amarre con capacidad de entre 10 y 15 toneladas y 42 defensas de goma tipo D para proteger las embarcaciones durante el atraque. El proyecto tambi\u00e9n contempla estudios batim\u00e9tricos, geot\u00e9cnicos y medioambientales. En el acto de entrega participaron el senador de Saman\u00e1, Pedro Catrain, la gobernadora provincial, Teodora Mullix, el alcalde Nelson N\u00fa\u00f1ez y la diputada Carmen Williams. Tambi\u00e9n asistieron representantes de las asociaciones de gu\u00edas tur\u00edsticos y de propietarios de embarcaciones, as\u00ed como ejecutivos del Grupo Pi\u00f1ero y del hotel Cayo Levantado Resort.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"footnotes":""},"categories":[56],"tags":[],"class_list":["post-146529","post","type-post","status-publish","format-standard","hentry","category-economia"],"_links":{"self":[{"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/posts\/146529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/comments?post=146529"}],"version-history":[{"count":1,"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/posts\/146529\/revisions"}],"predecessor-version":[{"id":146533,"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/posts\/146529\/revisions\/146533"}],"wp:attachment":[{"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/media?parent=146529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/categories?post=146529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/conexiondigital.com.do\/index.php\/wp-json\/wp\/v2\/tags?post=146529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}